Logistics Hall, G.P. Elektrokonzept, Germany

G.P. Elektrokonzept installed an electrical system in a logistics hall using our new product, SidePro. The cable containment bracket system offers the customer maximum flexibility, as the range consists of a single and back-to-back pendant, as well as the system being adjustable without tools.

“The installation of SidePro was very easy because the push-button cartridges are well made and saves us a lot of time. With a classic cantilever we need 10 minutes for installation, with the SidePro mechanism we need about 2 to 5 minutes!”
- Site Manager -
  • Building type: 5 000 m2 office building
  • Place: Tours, France
  • Building structure: Concrete
  • Product suspended: Cable baskets

In December 2021, the city of Tours opened a brand new office building. A firm known for working on the installation of electrical and air-conditioning equipment was in charge of the electrical networks suspension in the 5,000-m² concrete slab building.

In order to execute this project, the Site Manager decided to work with Gripple, a firm with a reputation for the quality of its innovative suspension systems. Therefore, when it came to completing work on this site in the time allowed, Gripple proposed using a single product: the Fast Trak - Segregated.

The Fast Trak is a ready-to-use supporting solution that does not involve any cutting, thus eliminating grinder related accidents. This product offers the quick, flexible installation of electrical systems as it can be adjusted without levelling tools.

This solution is bound to be appreciated by installers everywhere because, over and above the speed and ease of installation, the Fast Trak optimises maintenance and storage.

With Gripple products, the installer made a time saving of 7 days’ work. He therefore reduced 10 business days’ work to only 3 business days’ work. This degree of time saving divided total fitting costs by 3.

The installer, therefore, completed work on the site more quickly and the results are safe, clean and pleasing to the eye, as well as being easier on the pocket regarding installation costs.

The site manager says he’s delighted with the significant time saving and how easy it was to install. Preparation, installation and storage proceeded in an optimal fashion.

If you have any questions about this study and/or our products, please contact your local Gripple expert.

Tags: Building Services

Related Stories

Building Services
Logistics Hall, G.P. Elektrokonzept, Germany
02 May 2025
Building Services
SidePro, Rivoli Street, Paris France
07 April 2026

Featured Products