New

Spider™

A direct replacement for traditional concrete insert solutions, specifically used for metal deck and wood form constructions.

Where to Buy Enquire Now

Explore the product

Overview

  • Universal – one insert accommodates No.2 – No.5 swivel cable toggle kits
  • Versatile – universal design allows decision on rod size or cable size to be made after the slab is poured
  • Strong – up to 3000 lb / 1360 kg safe working load (always depends on structure and insert element size)
  • Secure – four wire anchors secure into concrete and ultrasonically welded head eliminates ingress during pour
  • Fast – below deck install saves time due to swivel toggle technology on both cable and rod attachments. No assembly required, dramatically reducing installation time

 

Gripple solutions deliver significant time savings during installation due to their ease of use and intuitive design. Take a look at the product in action below, and subscribe to the GrippleTV YouTube channel to stay in the loop with the latest Gripple video content.

Why use Gripple?

  • Significant time and cost savings on your project
  • Complete, off-site solutions which minimize health and safety concerns
  • Innovative, patented solutions designed by an in-house team of engineers
  • Considerable reductions in packaging, vehicle movements & embodied CO2
  • A range of support services at every stage of your project, provided by a dedicated technical team
  • Aesthetically pleasing solutions; lightweight and virtually invisible

Please find below all required downloads for the Spider Concrete Insert. If you require further information or a document that is not listed below, then please feel free to contact the team on +1 905 458 8700 and we will be happy to help.

Why use Gripple?

  • Significant time and cost savings on your project
  • Complete, off-site solutions which minimize health and safety concerns
  • Innovative, patented solutions designed by an in-house team of engineers
  • Considerable reductions in packaging, vehicle movements & embodied CO2
  • A range of support services at every stage of your project, provided by a dedicated technical team
  • Aesthetically pleasing solutions; lightweight and virtually invisible

Case studies

Gripple solutions have delivered faster project completion, enhanced aesthetics and significant reductions in CO2 on a growing number of showcase projects around the world. Take a look at some recent examples featuring the Spider Concrete Insert.

Building Services
Department of Finance, Ottawa, Ontario
02 September 2020
Building Services
New Horizon Mall, Alberta
03 September 2020

Why use Gripple?

  • Significant time and cost savings on your project
  • Complete, off-site solutions which minimize health and safety concerns
  • Innovative, patented solutions designed by an in-house team of engineers
  • Considerable reductions in packaging, vehicle movements & embodied CO2
  • A range of support services at every stage of your project, provided by a dedicated technical team
  • Aesthetically pleasing solutions; lightweight and virtually invisible

End Fixings

This product is only compatible with the Spider Swivel Cable Toggle and Spider Threaded Rod Adaptor end fixings.


Swivel Toggle

For use with both metal deck and wood form versions of the Gripple Spider, for the suspension of building services.

» Learn more

Why use Gripple?

  • Significant time and cost savings on your project
  • Complete, off-site solutions which minimize health and safety concerns
  • Innovative, patented solutions designed by an in-house team of engineers
  • Considerable reductions in packaging, vehicle movements & embodied CO2
  • A range of support services at every stage of your project, provided by a dedicated technical team
  • Aesthetically pleasing solutions; lightweight and virtually invisible

Accessories

Why use Gripple?

  • Significant time and cost savings on your project
  • Complete, off-site solutions which minimize health and safety concerns
  • Innovative, patented solutions designed by an in-house team of engineers
  • Considerable reductions in packaging, vehicle movements & embodied CO2
  • A range of support services at every stage of your project, provided by a dedicated technical team
  • Aesthetically pleasing solutions; lightweight and virtually invisible