Case Studies

Gripple products are in use in a variety of applications, on a multitude of projects around the world. Explore the full range of case studies, demonstrating the significant time, labour and cost savings Gripple solutions can deliver on your next project.

008
Building Services

Office, Guelph, Ontario, Electrical, Fast Trak Standard - Written

18 February 2022

New fast Trak demonstrates innovation in suspension systems at this two-story office build in Guelph, "Eliminating the need to cut and file the strut and rod made the installation about 8-10 times faster.”

Read more
Building Services
BC High Rise Project Saves 6 Hours Per Floor with Fast Trak
23 February 2023
Building Services
New Build Office in Guelph, Ontario reduces costs and saves time with the new Fast Trak range
18 February 2022
Building Services
New Build Office in Guelph, Ontario reduces costs and saves time with the new Fast Trak range
04 February 2022
Building Services
West Park Healthcare, Toronto
30 June 2021
Building Services
Humber College - Barrett Centre for Technology Innovation, Toronto
03 September 2020
Building Services
Half Moon Bay Public School, Ottawa, Ontario
02 September 2020
Building Services
Edmonton Board of Education, Alberta
02 September 2020
Building Services
EA Montreal, Quebec
02 September 2020
Building Services
LumiGroup Montreal, Quebec, Canada
25 August 2020
Building Services
New Academic Pavilion St-Jean Garrison (Electrical), St. Jean-sur-Richilieu, Quebec
11 December 2019
Building Services
Hospital Case Study
11 December 2019
Building Services
Broccolini Construction Offices, Mississauga, Ontario
11 December 2019

Gripple TV

The official video resource for Gripple Ltd - subscribe for access to the latest video material

View Channel
Use our product finder to verify your specification and suggest suitable products!

Why use Gripple?

  • Significant time and cost savings on your project
  • Complete, off-site solutions which minimize health and safety concerns
  • Innovative, patented solutions designed by an in-house team of engineers
  • Considerable reductions in packaging, vehicle movements & embodied CO2
  • A range of support services at every stage of your project, provided by a dedicated technical team
  • Aesthetically pleasing solutions; lightweight and virtually invisible
;