22 Bishopsgate, London

22 Bishopsgate is a 1,275,000 sq. ft commercial development located in the heart of the City of London. The 62 storey tower which stands at 278 metres has the capacity to hold a combined workforce of 12,000 people. Gripple supplied Trapeze Plus FR, Universal Brackets, XP2 (Express) Hangers and Fire Rated Hangers to this prestigious British project

Photography courtesy of Martin Richardson Images.

  • Building Type: Commercial / Office
  • Main Contractor: Multiplex
  • MEP Contractor: TClarke London
  • Services: Electrical Containment / HVAC / PAVA
"We used Gripple products due to their compact and lightweight nature. There was very limited storage space on-site and strict delivery schedules meant that using threaded rod and channel would have been more cumbersome for our team to transport across a busy central London project. The fact that using Gripple also led to a quicker and more aesthetically pleasing install was an added bonus!”
(Electrical Engineer, TClarke London)

Multiplex were employed as main contractor to build London’s newest skyscraper, 22 Bishopsgate. The 62-storey commercial office tower is the second tallest building in the UK (after The Shard). Located on the eastern side of Bishopsgate, the development is situated within close proximity to local transports hubs; Bank Underground Station and Liverpool Street station. The building’s main superstructure comprises a steel-framed tower with a central supporting concrete jump-form core. The new development contains 1,275,000 sq. ft. of workspace for various businesses to operate across. It’s the first UK tower to contain in excess of 100,000 sq. ft. of integrated amenity and social spaces for up to 12,000 people. The 278 metre tall tower has been constructed to support the people and businesses within. Inside the office tower there is a fresh food market, a ‘wellbeing retreat and curated art walk’, a basement bike park with 1,699 spaces and London’s highest free public viewing gallery. The building also contains the fastest lifts in Europe.

22 Bishopsgate was the largest project in London at the time of construction and space on-site was extremely limited. The MEP contractor, TClarke London, required a compact electrical containment suspension solution which could be transported and stored efficiently. Gripple’s lightweight suspension solution, Trapeze Plus FR, was used to suspend electrical containment on-site. These kits have been independently tested by BRE Global and offer a fully compliant, fire-resistant suspension system. Adjustments can be made completely tool-free, allowing installers to save time and labour and allow for changes during installation. In conjunction with Trapeze Plus FR, Universal Brackets were used to support cable containment on-site. Fire Rated Hanger kits were used for suspending fire alarm speakers (PAVA) on-site. Independently tested by BRE Global, these kits prevent alarm system cables becoming compromised or prematurely collapsing in the event of a fire. Gripple’s Fire Rated Hangers feature a stainless steel housing and springs which are corrosion and fire-resistant. They are used to suspend a variety of electrical and mechanical services in high-risk applications.

Within the CAT A floors XP2 (Express) Hangers were used to efficiently suspend HVAC services. Express Hangers are tool-free suspension kits with keyless release mechanisms for the fast suspension of a variety of building services. For the core HVAC works, XP2 kits and Magnetic Corner Saddles were used to suspend rectangular ductwork on-site. XP2 kits were also used to suspend additional primary spiral ductwork.

Gripple's Technical Services department provided TClarke with an installation design service on this project. TClarke were also supported on-site by the Gripple London team who have an office-based locally in the City. Due to their lightweight nature and the reduction in materials used, Gripple products also provide large weight and embodied CO2 savings. If required, reports can be generated for BREEAM assessors to meet development targets. For more information please contact Gripple Technical Services.

  Electrical Services HVAC Total Savings
Overview  CAT A fit-out (51 floors) and subsequent CAT B fit-outs CAT A fit-out (51 floors), subsequent CAT B fit-outs and core works -
Gripple Products  Trapeze Plus FR,
Universal Brackets,
Cable Basket Clips, Fire Rated Hangers & Y-Fit Accessories
Express Hangers &
Corner Saddles 
-
Labour Time Saved (vs Traditional)  19,242 hours 7,030 hours 26,272 hours
Weight Reduction (vs Traditional)  30,406 kg 29,935 kg 60,341 kg
Embodied CO2 Saved 69,022 kg 67,953 kg 136,975 kg
Equivalent of Planting  442 trees 435 trees 877 trees
Download
Tags: Building Services

Related Stories

Building Services
IP9 Distribution Centre, iPort, Doncaster
07 July 2020
Building Services
Westfield Stratford City M7A, London
03 April 2020
Building Services
Strawberry Place, Newcastle, UK
16 September 2019

Featured Products

Why use Gripple?

  • Innovative, patented solutions designed by an in-house team of engineers
  • Considerable reductions in packaging, vehicle movements & embodied CO2
  • A range of support services at every stage of your project, provided by our technical team
  • Complete, off-site solutions which minimise health and safety concerns
  • Significant time and cost savings on your project